Landfill exploration, Pilot study - excavation of biocell reactors at NSR, Helsingborg

The Project is a prestudy that aims to test excavation and material recovery from a landfill. Around 1 000 m3 of waste will be excavated from the biocellreactors and treated (drying, sorting) and analysed. Earlier studies has been mainly theoretical. The prestudy creates an empirical basis to evaluate the technically/economical possibilities for an effective material recovery from thedeposited waste.

Recycling

Project manager
Eric Rönnols
Organisation
Nordvästra Skånes Renhållnings AB
Project time
2016-09-02 to 2017-05-15
Status
Finalized

Contact

Eric Rönnols

project manager, Nordvästra Skånes Renhållning